Industry frames and envelopes

Industry frames and envelopes

Our frames and envelopes, as one integrated delivery, optimise installation resources, and offers efficiency and improved safety on site. With more than 40 years of industry project experience, we can ensure reliability for both local and international heavy industries.

Services for industry frames and envelopes

Design and build frame contracting

Ruukki offers excellent product development and optimal design decisions in the development and implementation phases. We can also offer excellent project management resources and expertise.

Frame and envelope optimisation

Our most extensive service concept makes it possible for developers in single-storey buildings to have direct control of investment and operating costs of the building from very early stages on. We can optimise the building envelope and frame to meet the specific goals of the project and even optimise the lifecycle energy costs covering also the HVAC system.

Related products

Welded girders

Sandwich panels

Facade claddings

References

Kaunisvaara mine

"We at Peab are pleased we chose Ruukki as the steel structure contractor. Throughout the entire sourcing process, we have felt that we made the right decision as regards quality, environment, working environment, follow-up and delivery reliability." Tommy Lindmark, Project director, Peab AB of Sweden

Fortum, Jelgava

Ruukki delivered steel frame structures and complex envelope products.

Äänekoski bioproduct mill

Ruukki’s scope of work for bioproduct mill consisted of manufacturing, delivery, erection work of steel structures and claddings.

Akmenes Cementas Clinker Plant

Akmenės Cementas is a Lithuanian cement manufacturing company. In order to build its new plant the company chose steel frame structure, load-bearing sheets and facade profiles from Ruukki.

Outokumpu Ferrochrome Smelter

Outokumpu plans to double its ferrochrome production capacity in Finland.

Ostroleka Biomass Boiler House

Because of the building height, safety measures had to be taken into special consideration already at the planning stage. All working platforms had to be temporarily secured with railings and all openings covered with thick wooden plates. Around 1 km of railings was used in total.

Contact us